Audi Georgia plant planned for first US site
Audi will build its first US plant in Georgia, a $4 billion SUV factory near Macon set to employ about 4,500 people, with full production planned for 2031.
by Trends DeskNovember 19, 20263 min read

Audi will build its first car factory in the United States, at the Middle Georgia Megasite in Peach County near Macon, Georgia, in a project worth more than 4 billion dollars. President Donald Trump announced the plan at a campaign rally in Perry, Georgia, on Saturday, putting the figure at 4.2 billion dollars and crediting his tariffs. Audi confirmed the Audi Georgia plant plan in its own release, giving the investment as about 4 billion dollars, with about 4,500 jobs and annual capacity of up to 200,000 premium SUVs. The Audi Georgia plant will be the brand's first production site on American soil.
The timeline for the Audi Georgia plant is longer than the rally announcement suggested. Trump said construction would begin next month. Audi and Georgia officials put site grading in 2027, construction in 2028 and full production in 2031, while Audi described production as starting in the early 2030s. The state said its Georgia Quick Start program will build a training center and start classes before the plant is finished. Reporting on the announcement named the Q7, Q8 and Q9 as the Audi SUVs planned for the site, and said the plant will focus on high end SUVs designed for American buyers.
Audi Georgia plant and tariffs
Audi US production at the Audi Georgia plant changes the brand's position in the American market. Audi currently imports the vehicles it sells in the United States from Europe and Mexico, which leaves it exposed to import duties in a way that rivals with North American factories are not. Trade reporting put the duty on German built vehicles at 15 percent, down from 25 percent. Audi said a stronger North American presence will reduce its exposure to trade and currency risks and turn the region into a third production pillar beside Europe and China. Trump presented the Audi Georgia plant as proof that tariffs bring factory investment to the United States.
The announcement also carried a political timetable. The Associated Press reported that the rally appearance was timed to help Republican candidates in Georgia ten days before the 3 November midterm elections, including Representative Mike Collins, who is challenging Democratic Senator Jon Ossoff. Audi chief executive Gernot Dollner told reporters at a roundtable reported by CNBC that the administration asked Audi to make the announcement at the event, and he described the project as a three year effort that happened to reach that moment. He said the decision covered more than 70 locations and involved intense talks with officials. The Audi Georgia plant therefore arrived as both an industrial decision and a campaign stage event.
Audi Georgia plant jobs and training
Georgia officials said pay for all roles at the Audi Georgia plant will be competitive and well paying for the local market, but they gave no pay figures. Neither the company release nor the state release listed tax breaks or other incentives offered by state or local governments. The 4,500 jobs compare with at least 8,500 jobs promised by Hyundai's 7.59 billion dollar Metaplant near Savannah, which Georgia's economic development department describes as the largest economic deal in state history. Audi US production at the new site will still be smaller than that project, but it gives Georgia a second large foreign car factory.
For Audi, the Audi Georgia plant answers a long standing gap. Mercedes-Benz and BMW built American factories long ago, while Audi kept importing. Audi Macon plant output of up to 200,000 Audi SUVs a year would give the brand local supply for its largest models and room to grow in the second largest premium market in the world, in Dollner's words. The Audi Georgia plant will not hire at scale for years, since site grading is set for 2027 and construction for 2028. Full production at the Audi Macon plant is planned for 2031, with about 4,500 jobs and capacity of up to 200,000 SUVs a year at the Middle Georgia Megasite.





